2008
Spring Projects at the L Double R...
Spring
is here! With snow drifts slowly melting away (despite new snow
continuing to fall), the temperatures steadily rising, and Environmental
Education in session, summer comes ever closer.
As
such, preparations are underway. Below is the list of projects
to be completed by the start of Staff Orientation on May 27th.
|
SKY
RANCH PROJECTS
TO BE COMPLETED BY STAFF ORIENTATION
For ways that you can help with
these projects CLICK
HERE
For ways that you can help with other camp needs CLICK
HERE
For pictures of ALREADY COMPLETED PROJECTS CLICK
HERE |
| 
|
Christ
Lodge
Replace the entry steps and ramp on
the lodge
Install two new water heater
Epoxy the floor of the dining hall
and serving room
COMPLETED!
Click here for pictures |
| |
String
Fellow
Conversion into suitable
housing; replacement of ceiling and walls
|
| 
|
Staff
Housing
Convert the former Arts and Crafts
building into suitable staff housing, including replacing floors,
roof, and windows
|
| |
Shower
House
|
| 
|
Backpack Center
Completion of the new deck, including
stairs and a ramp.
|
| |
Schramm
Replacement of the front deck
|
| |
Hutchinson
Replacement of the front deck
|
|
Bonhoeffer
Replacement of the entry steps
and back deck |
SKY
RANCH PROJECTS
COMPLETED!
Christ Lodge: Dining Room Floor
/ Fridge and Freezer Floors
|
|
|
| Steve and this summer's
Ranch Hand Specialist, Chris Maddox. Steve and Chris
completed the floor in two days, including one day of
preparation and one day of painting. |
A near complete dining room. The
epoxy is a mild tan and helps to bring out the color
of the wood on the wall and ceiling. It helps bring
a new warmth to the room. |
Steve Miller preparing the concrete
floor by filling in the existing cracks. After the cracks
were filled the floor received a coat of primer to help
the epoxy adhere to the concrete. |
Shower House
| |
Volunteers from Front Range churches--Zion
and King of Glory in Loveland, Our Saviors in Greeley,
and Our Savior's and Trinity in Fort Collins--started
the showerhouse remodel on May 3rd, during the 1st Summer
Trip Prep Day. Projects that day include removing all
toilets and replacing all the internal components, cleaning
all surfaces with bleach and shop-vac's, removing caulk
around the countertops and floor boards, and painting
the partitions in the female side. |
 |
Steve Miller
works on the partitions in male side of the showerhouse.
The renovations of the showerhouse include a fresh coat
of paint on the walls, partitions, ceiling, and floor,
new sinks and fixtures, and the replacement of all the
toilet valves. In the words of Chris Maddox, Ranch Hand
Specialist, "It's a new place!" Pictures of
the completed showerhouse will be coming soon. |
Projects completed on May 3rd
Summer Trip Prep Day
A special thanks to all those folks who came
up to camp for a day of team building, work projects, and
looking forward. Thanks to Zion Lutheran, King of Glory, Our
Savior's Greeley, Our Savior's Fort Collins, and Trinity,
we were able to get quite a bit accomplished and have a good
time while doing it!
|
|
|
| Bench Painting |
Staff Housing
Demolition |
Woods Splitting and Stacking
|
|
|